Andhra Pradesh industrial electricity tariff: HT III(A) and LT III(A).
Every line on an APEPDCL, APCPDCL or APSPDCL factory bill, from APERC’s retail supply tariff at the 2026-27 rates. Then a worked bill for a 500 kVA plant at 11 kV, what one demand spike above contract demand adds, and what the peak hours cost.
Who this page covers
Andhra Pradesh has three distribution companies: APEPDCL (Eastern Power Distribution Company), APCPDCL (Central Power Distribution Company) and APSPDCL (Southern Power Distribution Company), which have taken over the areas of the rural electric co-operatives (RESCOs). All three bill on one retail supply tariff set by the Andhra Pradesh Electricity Regulatory Commission (APERC). It applies from 1 April 2026 to 31 March 2027.
Industry is billed under two schedules:
- HT Category III(A) Industry (General): supply at 11 kV, 33 kV, 132 kV or 220 kV, with demand charges per kVA and every unit priced by the hour it is used.
- LT Category III(A) Industry (General): low-tension supply up to a connected load of 150 kW (200 HP), with fixed charges per kW. Above 75 kW (100 HP) the consumer may choose HT supply instead.
HT industry rates for 2026-27
HT III(A) industry pays a demand charge of ₹475 per kVA of billing demand a month. There is no single energy rate: every kVAh is billed at the rate of the hour it is used, and the peak rate is higher in the months of high grid demand.
| Hours | 11 kV | 33 kV | 132 kV | 220 kV |
|---|---|---|---|---|
| Peak, 6 – 10 am and 6 – 10 pm: Feb – May, Sep – Oct | ₹7.80 | ₹7.35 | ₹6.90 | ₹6.85 |
| Peak, 6 – 10 am and 6 – 10 pm: Jun – Aug, Nov – Jan | ₹7.30 | ₹6.85 | ₹6.40 | ₹6.35 |
| Normal, 3 – 6 pm and 10 pm – midnight | ₹6.30 | ₹5.85 | ₹5.40 | ₹5.35 |
| Off-peak, 10 am – 3 pm and midnight – 6 am | ₹5.55 | ₹5.10 | ₹4.65 | ₹4.60 |
Energy charges in ₹ per kVAh.
Every HT service also pays a customer charge of ₹1,406 a month at 11 kV and ₹2,813 at 33 kV and above. Other HT industry categories:
| HT category | Energy charge, 11 / 33 / 132 / 220 kV | Demand charge, a month |
|---|---|---|
| III(A) industrial colonies | ₹7.00 at all voltages | Nil |
| III(B) seasonal industries, off-season | ₹7.65 / ₹6.95 / ₹6.70 / ₹6.65 | ₹475 per kVA |
| III(C) energy intensive industries | ₹5.80 / ₹5.35 / ₹4.95 / ₹4.90 | ₹475 per kVA |
| II(A) commercial | ₹7.65 / ₹6.95 / ₹6.70 / ₹6.65 | ₹475 per kVA |
If colony consumption is not metered separately, 15% of the plant’s units are billed at ₹7.00 and the rest at the industry rates. A seasonal industry pays its off-season demand charge on the recorded demand or 30% of contract demand, whichever is higher, and is billed as III(A) during its season. HT commercial pays ₹1.00 per kVAh more from 6 to 10 pm.
LT III(A) industry rates
| Load and hours | Energy charge | Fixed charge, a month |
|---|---|---|
| Up to 15 kW (20 HP), all hours | ₹6.70 | ₹75 per kW |
| Above 15 kW, normal hours (3 – 6 pm, 10 pm – 10 am) | ₹6.70 | ₹75 per kW |
| 15 – 25 kW, peak 6 – 10 pm | ₹7.20 | ₹75 per kW |
| 15 – 25 kW, off-peak 10 am – 3 pm | ₹6.20 | ₹75 per kW |
| 25 – 150 kW, peak 6 – 10 pm | ₹7.70 | ₹75, or ₹275 above 75 kW |
| 25 – 150 kW, off-peak 10 am – 3 pm | ₹5.70 | ₹75, or ₹275 above 75 kW |
Energy charges in ₹ per kWh or kVAh.
The fixed charge is on the higher of contracted load and recorded demand. Three-phase LT industry is billed in kVAh, and then the ₹ per kW rate is applied per kVA. The LT customer charge goes by load: ₹63 a month up to 20 HP, ₹250 from 21 to 50 HP and ₹938 from 51 to 200 HP. Off-season, a seasonal LT industry pays ₹75 per kW on 30% of contracted load or the recorded demand, whichever is higher, and ₹7.45 per unit. Cottage industries up to 20 HP pay ₹20 per kW and ₹3.75 per unit.
A 60 kW LT industry using 12,000 kVAh a month, 2,500 of them from 6 to 10 pm and 4,000 from 10 am to 3 pm, pays about ₹84,338 before duty: ₹4,500 fixed, ₹78,900 energy and ₹938 customer charge.
Billing demand and the minimum energy charge
On HT, the demand charge is on the higher of the maximum demand recorded in the month and 80% of contract demand. Maximum demand is read over 30-minute blocks, or 15-minute blocks above 4,000 kVA of contract demand. A 500 kVA plant pays for at least 400 kVA every month, ₹1,90,000 at ₹475. At 470 kVA it pays for 470 kVA.
There is also a minimum energy charge: HT industry is billed for at least 50 kVAh per kVA of billing demand a month. At 470 kVA of billing demand, that is 23,500 kVAh; a month that uses fewer is billed as if it used 23,500.
Maximum demand above contract demand
When recorded maximum demand goes above contract demand, the demand above it is billed at two times the normal demand charge, ₹950 per kVA. From 120% upwards, a share of the month’s energy is penalised too. That share is the excess demand divided by the maximum demand, times the units of the month.
| Maximum demand, as a share of contract demand | Demand charge on the excess | Energy charge on the excess share |
|---|---|---|
| Above 100% up to 120% | Two times the normal rate | Normal |
| Above 120% up to 200% | Two times the normal rate | 1.5 times normal |
| Above 200% | Two times the normal rate | Two times normal |
The MD penalty guide explains how one spike sets a whole month’s charge.
Time of day
For HT III(A) industry, time of day is not an extra charge on top of a normal rate: the rates in the table above are the energy rates. Moving a kVAh from a peak hour to an off-peak hour at 11 kV saves ₹2.25 from February to May and in September and October, and ₹1.75 in the other months. The off-peak rate is 75 paise below the normal rate, which the DISCOMs describe as an incentive for industrial use in off-peak hours.
On LT III(A), time of day applies above 15 kW, all year: only 6 to 10 pm is peak and only 10 am to 3 pm is off-peak. Aqua and poultry hatcheries and feed mixing plants are billed at the normal rate without time of day.
kVAh billing and power factor
HT energy and most LT energy are billed in kVAh, so there is no capacitor surcharge: a low power factor raises the units themselves. A plant that uses 1,35,000 kWh at a power factor of 0.90 is billed for 1,50,000 kVAh. At 0.98 it would be billed for about 1,37,755 kVAh, about ₹78,000 less a month at the worked example’s average rate of ₹6.35. The kVAh billing guide explains the difference.
HT consumers should keep power factor between 0.95 lag and 0.95 lead. A consumer below 0.95 lead for two months in a row must bring it back within three months, or supply may be disconnected.
Other lines on the bill
- FPPCA (fuel and power purchase cost adjustment) and any true-up are added per unit as APERC orders. Take the current figure from your bill.
- Green tariff: 75 paise per unit over the normal tariff, only for consumers who opt for renewable energy from the DISCOM.
- Voltage surcharge: existing HT services taking supply below the voltage set for their contract demand pay 12% more on demand and 10% more on energy.
- Late payment: on HT, a delayed payment surcharge of 5 paise per ₹100 a day, at least ₹550. On LT III(A), 5 paise per ₹100 a day, at least ₹150.
Electricity duty is charged on top under the AP Electricity Duty Act, 1939; take its rate from your latest bill. It is not part of the APERC tariff.
Worked example: a 500 kVA plant at 11 kV
An illustrative HT III(A) general industry at 11 kV with a contract demand of 500 kVA, in a high-demand month such as October. Its maximum demand is 470 kVA, and it uses 1,50,000 kVAh in the month: 40,000 in the peak hours, 70,000 off-peak and 40,000 in normal hours.
| Bill line | Working | Amount |
|---|---|---|
| Demand charge | 470 kVA × ₹475 (above 80% of 500 kVA) | ₹2,23,250 |
| Peak-hour energy | 40,000 kVAh × ₹7.80 | ₹3,12,000 |
| Normal-hour energy | 40,000 kVAh × ₹6.30 | ₹2,52,000 |
| Off-peak energy | 70,000 kVAh × ₹5.55 | ₹3,88,500 |
| Customer charge | 11 kV | ₹1,406 |
| Before FPPCA and electricity duty | About ₹7.85 per kVAh | ₹11,77,156 |
Illustrative figures from the APERC tariff schedule. In a low-demand month the peak rate is ₹7.30 and the same bill is ₹11,57,156. Add FPPCA and electricity duty from your bill. Work out your own bill with the electricity bill calculator.
What one demand spike costs
Suppose the same plant has one bad 30-minute block, say several heavy motors restarting together after a power cut, and maximum demand reaches 560 kVA. The demand charge goes up to the full 500 kVA, ₹14,250 more, and the 60 kVA above contract demand pays ₹950 each, ₹57,000. The bill goes from ₹11,77,156 to ₹12,48,406: ₹71,250 more.
If the spike reaches 620 kVA, 124% of contract demand, the excess demand costs ₹1,14,000. And 120 ÷ 620 of the month’s 1,50,000 kVAh, about 29,032 kVAh, is excess energy billed at 1.5 times: at the average rate of ₹6.35, ₹92,177 more. The bill becomes ₹13,97,583: ₹2,20,427 more, for one spike.
What the peak hours cost
The plant above pays ₹7.80 for each of its 40,000 peak-hour kVAh, against ₹5.55 off-peak. Moving 10,000 kVAh a month from the peak hours into 10 am – 3 pm saves ₹22,500 in a high-demand month and ₹17,500 in a low-demand month, about ₹2.4 lakh a year.
Where Andhra Pradesh plants usually save
- Keep maximum demand at or below contract demand. Every kVA above it costs ₹950 for the month.
- Never let maximum demand reach 120% of contract demand. Above it, the excess share of the month’s energy costs 1.5 times.
- Move load out of 6–10 am and 6–10 pm into 10 am – 3 pm. Each kVAh moved saves up to ₹2.25 at 11 kV.
- Keep power factor near unity. With kVAh billing, every point of power factor lost is paid for in units.
- Size contract demand to real demand. Billing demand is never below 80% of it, so a plant that never goes above 300 kVA on a 500 kVA contract pays for 100 kVA it does not use, ₹47,500 a month.
How KONDUKTOR® EMS helps
KONDUKTOR® EMS reads the multifunction meters already on your panels and shows, while the month is still running, the numbers this tariff bills you on.
- Running maximum demand against contract demand, with a warning before 100% and 120% are crossed.
- kVAh by time of day for each meter, so peak-hour units are seen the same day.
- Power factor for each meter, so a drop that inflates kVAh is caught early.
- Twelve months of maximum demand history, to size contract demand.
Common questions
What is the industrial electricity tariff in Andhra Pradesh for 2026-27?+
On APEPDCL, APCPDCL and APSPDCL, HT III(A) industry pays ₹475 per kVA of billing demand a month, and energy by the hour: at 11 kV, ₹7.80 or ₹7.30 per kVAh in peak hours, ₹6.30 in normal hours and ₹5.55 off-peak, lower at 33, 132 and 220 kV, plus a customer charge of ₹1,406 or ₹2,813. LT III(A) industry pays ₹75 per kW a month and ₹6.70 per unit. FPPCA and electricity duty are added.
What is the penalty for exceeding contract demand in Andhra Pradesh?+
Demand above contract demand is billed at two times the normal demand charge, ₹950 per kVA on HT III(A). Above 120% of contract demand, the excess share of the month’s energy, excess demand divided by maximum demand times the units, is billed at 1.5 times the normal rate, and above 200% at two times.
How is billing demand worked out on an Andhra Pradesh HT bill?+
It is the higher of the maximum demand recorded in the month and 80% of contract demand. A 500 kVA plant pays demand charges on at least 400 kVA, ₹1,90,000 a month at ₹475.
What are the ToD timings for industry in Andhra Pradesh?+
For HT III(A) industry, peak hours are 6 am to 10 am and 6 pm to 10 pm, off-peak hours are 10 am to 3 pm and midnight to 6 am, and 3 pm to 6 pm and 10 pm to midnight are normal. The peak rate is higher from February to May and in September and October. On LT III(A) above 15 kW, only 6 pm to 10 pm is peak and 10 am to 3 pm is off-peak.
What is the minimum energy charge for HT industry in Andhra Pradesh?+
HT III(A) industry is billed for at least 50 kVAh per kVA of billing demand a month. At 470 kVA of billing demand, a month that uses fewer than 23,500 kVAh is billed for 23,500.
What is the LT industrial tariff in Andhra Pradesh?+
LT III(A) industry pays ₹75 per kW a month, ₹275 per kW for load above 75 kW, and ₹6.70 per unit. Above 15 kW, units from 6 pm to 10 pm cost ₹7.20 or ₹7.70 and units from 10 am to 3 pm cost ₹6.20 or ₹5.70, by load. The customer charge is ₹63, ₹250 or ₹938 a month by HP.
Is there a power factor penalty in Andhra Pradesh?+
Where energy is billed in kVAh, as it is on HT and on three-phase LT industry, no capacitor surcharge is levied. A low power factor raises the billed units instead: at 0.90, 1,35,000 kWh is billed as 1,50,000 kVAh. HT consumers should also stay between 0.95 lag and 0.95 lead.
Sources: Andhra Pradesh Electricity Regulatory Commission, Retail Supply Tariff Order FY 2026-27, Chapter XI (retail supply tariff schedule, with terms and conditions), for APEPDCL, APCPDCL and APSPDCL. Published on aperc.gov.in. Electricity duty is set by the State Government.