Capacitor calculator

kVAr calculator: which capacitor bank do you need?

Answer a few questions from your electricity bill or meter. Get the APFC panel size to ask for, how its steps should be split, and what it saves.

By Madhusudan Rathi, founder · Updated 31 October 2026 · Worked out in your browser — nothing you type is sent anywhere

What do you have?
More details optional
Your own transformer? HT connection
Solar panels on the same supply?
Machines with drives (VFD), UPS or welding?
Supply drawn now and with the panel: the beer is the working kW, the foam is kVAr, the full mug is the kVA you pay for Now With panel 353 kW 353 kW 400 kVA 360 kVA
kW does the workFoam is kVArYou pay for the full mug

Ask for an APFC panel of about130 kVArat 415 V, in 7 steps

  • You save about ₹96,000 a month on kVAh billing.
  • Ask for 7 steps: one of 10 kVAr and six of 20 kVAr, so the panel follows your load.
  • Do not keep capacitors always on. When the plant runs light, extra capacitors turn the power factor leading.

Your panel as the load changes

10202020202020

At 353 kW the panel switches on 120 kVAr · power factor 0.98

For your electrician or panel maker
Power factor now → target
0.88 → 0.98
Peak load MD × power factor
353 kW
kVAr for the load
117 kVAr
APFC panel at 415 V
130 kVAr
Steps
1 × 10 + 6 × 20 kVAr
Relay
8 stages one spare
Capacitors
Standard duty, 440 V
Nameplate kVAr at 440 V
146 kVAr
Relay CT and C/k
800/5 · 0.09
Current per 20 kVAr step
28 A fuse and cable for 42 A
MD after
360 kVA
Cable and transformer losses
about 19% lower
kVAh a month
1,36,000 → 1,22,449
Assumed
kVAh billing, 50 Hz. Use your nameplate values where you have them.

An estimate for planning. The final size needs readings from your site, and a harmonic check where drives are a big part of the load. Defaults are illustrative — replace them with your own.

How the size is worked out

  • Power factor from the bill. Units (kWh) ÷ kVAh. 1,20,000 ÷ 1,36,000 = 0.88.
  • Load to correct. Maximum Demand × power factor, so the panel covers your busiest half hour. Without an MD, units ÷ running hours, which is the average load.
  • kVAr needed. Load in kW × the multiplier in the table below, for your power factor now and the one you want.
  • Steps. One small step and the rest twice its size, so the panel can switch on almost any amount in small jumps. The relay gets one spare stage.
  • Own transformer. Its magnetising kVAr is on your bill but the APFC panel cannot see it, so a small fixed capacitor goes on the transformer: about 1.5% of its kVA rating is typical.
Power factor nowTo 0.95To 0.98To 0.99To 1.00
0.700.6920.8170.8781.020
0.750.5530.6790.7390.882
0.800.4210.5470.6080.750
0.850.2910.4170.4770.620
0.880.2110.3370.3970.540
0.900.1560.2810.3420.484
0.95—0.1260.1860.329

kVAr = kW × multiplier. A 500 kW load at 0.85, corrected to 0.98: 500 × 0.417 = 208 kVAr.

Why not aim for 1.00

Correcting all the way to 1 needs a much bigger panel for very little gain, and when the plant runs light the same capacitors turn the power factor leading. Aim for 0.98 to 0.99.

kVAr to microfarad and amps

For checking a capacitor on the bench, or sizing its fuse and cable.

Capacitor connected in

Each phase should read about137.0 µFRated current 32.8 A per line

A capacitor reading well below this has lost kVAr and should be replaced.

Capacitor for a motor

A capacitor fixed at a motor and switched with it corrects that motor only. Keep it below the motor’s own no-load kVAr, or the motor can self-excite when switched off and damage itself and the capacitor.

Fit a capacitor of up to7.5 kVArThe motor’s limit is about 7.8 kVAr (90% of its no-load kVAr)

For star-delta starters, reversing, crane or hoist motors, ask the motor maker first.

Safety points for panel builders

  • Discharge. Each capacitor needs discharge resistors that bring it to 75 V or less within 3 minutes of switch-off.
  • Reconnection delay. Set the relay so a step is not switched back on while it is still charged.
  • Contactors. Use capacitor-duty contactors, with resistors that limit the switch-on surge.
  • Fuses and cable. Size them for about 1.5 times the step’s rated current: capacitors run above nameplate current with harmonics and high voltage.
  • Heat. Heat is what ages capacitors fastest. Give the panel fans and filters, and keep it out of the sun.
  • Relay CT. On the incomer, before every load and before the panel itself, in the phase the relay expects.
  • On DG. Keep the panel off, or limited to a few steps. A leading power factor can push the DG’s voltage up and trip it.

Standards this follows

The calculator follows the practice in these standards. They are guidance here; the panel maker certifies the panel.

  • IS 7752 (Part 1): guide for improving power factor in consumer installations.
  • IS 13340-1 and -2, the same as IEC 60831-1 and -2: low-voltage shunt power capacitors.
  • IEC 61921: low-voltage power factor correction banks.
  • IS/IEC 61439-1 and -2: low-voltage switchgear assemblies, the panel itself.
  • IEC 60076-6: reactors, for detuned panels.
  • IEEE 18 and IEEE 1036: shunt capacitors and how to apply them.
  • IEEE 519: harmonic limits, referred to by the CEA connectivity regulations.

Two worked examples

  • A new panel. A 500 kW plant at power factor 0.85 needs about 208 kVAr to reach 0.98. Ask for a 225 kVAr APFC panel: one 25 kVAr step and four 50 kVAr steps.
  • A panel already installed, bill still at 0.88. 1,20,000 units, 1,36,000 kVAh, 16 hours a day for 26 days, 200 kVAr installed. About 95 kVAr of it is not working. Fixed, the bill drops by about 13,551 kVAh a month, about ₹96,212 at ₹7.10.

Power factor in KONDUKTOR® EMS

  • Power factor and lagging and leading kVArh are logged for every meter, every few seconds. A failed step, or a leading power factor at night, shows the same day, not on next month’s bill.
  • It flags a low power factor under load, the usual sign of a capacitor step that is off or has failed.
  • The savings page sizes the capacitor for each meter from its own readings.

Alerts when a panel’s power factor drops are set up for your plant as part of your project.

Common questions

How do I know what size capacitor I need?+

From your bill: the units, the kVAh and the hours your plant runs. Or from your meter: the load in kW and the power factor at full load. A 500 kW plant at 0.85 needs about 208 kVAr to reach 0.98, so you would ask for a 225 kVAr APFC panel.

Why is my power factor low even with an APFC panel?+

Usually a step has failed, capacitors have lost kVAr with age, the relay’s CT is in the wrong place, or the load has grown. On an HT connection, the transformer also lowers the power factor on your bill.

Should I aim for a power factor of 1?+

No. Aim for 0.98 to 0.99. A panel sized for 1 turns the power factor leading when the plant runs light, and many tariffs charge for that too.

Not sure what your bill is telling you? Send it to us.