Bill calculator
Electricity bill calculator: HT or LT, demand, energy and TOD in one bill.
Pick HT or LT and your state, then enter demand and units from the bill. Rates are filled in for Uttar Pradesh (HV-2, LMV-6), Gujarat GUVNL (HTP-I, LTMD), Torrent Power Ahmedabad and Surat (HT and LT), Tamil Nadu (HT-I, LT-IIIB), Maharashtra MSEDCL (HT I(A), LT V, also Torrent Power Bhiwandi), Rajasthan (HT-5, LT-6), Madhya Pradesh (HV-3.1, LV-4), Delhi (industrial, LT and HT), Karnataka (HT-2(a), LT-5), Haryana (HT and LT supply), Punjab (Large Supply, Medium Supply, Small Power), Telangana (HT-I(A), LT-III), Andhra Pradesh (HT III(A), LT III(A)), West Bengal (WBSEDCL and CESC Kolkata, HV and LT), Odisha (HT and LT), Chhattisgarh (HV-3, HV-4, LV-5), Jharkhand (HTS, HTSS, LTIS), Uttarakhand (RTS-5) and Himachal Pradesh (LIPS, MIP, SIP). See every bill line and the cost per unit.
UPERC 2026-27 · HV-2, urban
Bill before FPPAS and duty₹9,71,325₹8.09 per kVAh · ₹9,61,612 if paid by the due date
- Billable demand
- 380 kVA
- Demand charge
- ₹1,14,000
- Excess-demand charge
- ₹0
- Energy charge
- ₹8,52,000
- TOD peak surcharge
- ₹31,950
- TOD off-peak rebate
- −₹26,625
- Due-date rebate
- −₹9,713
- Paid by the due date
- ₹9,61,612
- Cost of 10 kVA more Maximum Demand
- ₹3,000
GERC from 1 April 2026 · HTP-I, PGVCL, DGVCL, MGVCL, UGVCL
Bill before FPPAS and duty₹5,25,900₹4.38 per kWh
- Billing demand
- 380 kVA
- Demand charge
- ₹57,000
- Charge above Contract Demand
- ₹0
- Energy charge
- ₹4,80,000
- Peak-hour charge
- ₹13,500
- 11 am – 5 pm rebate
- −₹15,000
- Power factor adjustment
- −₹4,800
- Supply-voltage rebate
- −₹4,800
- Cost of 10 kVA more Maximum Demand
- ₹1,500
GERC from 1 April 2026 · Torrent Power Ahmedabad–Gandhinagar HTMD-1
Bill before FPPAS and duty₹6,67,852₹5.57 per kWh
- Billing demand
- 380 kW
- Demand charge
- ₹98,800
- Charge above Contract Demand
- ₹0
- Energy charge
- ₹5,46,000
- Peak-hour charge
- ₹30,000
- 11 am – 3 pm rebate
- −₹5,400
- Power factor adjustment
- −₹1,548
- Cost of 10 kW more Maximum Demand
- ₹2,600
GERC from 1 April 2026 · Torrent Power Surat HTMD-I
Bill before FPPAS and duty₹6,43,180₹5.36 per kWh
- Billing demand
- 380 kVA
- Demand charge
- ₹64,600
- Charge above Contract Demand
- ₹0
- Energy charge
- ₹5,76,000
- Peak-hour charge
- ₹19,500
- 11 am – 3 pm rebate
- −₹5,400
- Power factor adjustment
- −₹11,520
- Supply-voltage rebate
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹1,700
TNERC Tariff Order 6 of 2025 · HT-I industries, TNPDCL
Bill before FPPAS and duty₹11,77,915₹9.82 per kWh
- Billable demand
- 380 kVA
- Demand charge
- ₹2,31,040
- Demand above Contract Demand (double rate)
- ₹0
- Energy charge
- ₹9,00,000
- Peak-hour surcharge (25%)
- ₹56,250
- Night rebate (5%)
- −₹9,375
- Power factor compensation
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹6,080
UPERC 2026-27 · LMV-6, urban, kVAh billing
Bill before FPPAS and duty₹1,13,890₹7.59 per kVAh · ₹1,12,751 if paid by the due date
- Billable demand
- 55 kVA
- Demand charge
- ₹14,355
- Excess-demand charge
- ₹0
- Energy charge
- ₹98,550
- TOD peak surcharge
- ₹3,942
- TOD off-peak rebate
- −₹2,957
- Due-date rebate
- −₹1,139
- Paid by the due date
- ₹1,12,751
- Cost of 10 kVA more Maximum Demand
- ₹5,220
GERC from 1 April 2026 · LTMD, PGVCL, DGVCL, MGVCL, UGVCL
Bill before FPPAS and duty₹1,28,190₹5.13 per kWh
- Billing demand
- 92 kW
- Demand charge
- ₹12,440
- Charge above Contract Demand
- ₹0
- Energy charge
- ₹1,15,000
- Peak-hour charge
- ₹3,150
- 11 am – 5 pm rebate
- −₹3,000
- Reactive energy charge
- ₹600
- Cost of 10 kW more Maximum Demand
- ₹2,090
GERC from 1 April 2026 · Torrent Power Ahmedabad–Gandhinagar LTMD-2
Bill before FPPAS and duty₹1,43,928₹5.76 per kWh
- Billing demand
- 92 kW
- Demand charge
- ₹19,250
- Charge above Contract Demand
- ₹0
- Energy charge
- ₹1,25,000
- Power factor adjustment
- −₹322
- Cost of 10 kW more Maximum Demand
- ₹3,250
GERC from 1 April 2026 · Torrent Power Surat LTMD
Bill before FPPAS and duty₹1,37,550₹5.50 per kWh
- Billing demand
- 92 kVA
- Demand charge
- ₹15,700
- Charge above Contract Demand
- ₹0
- Energy charge
- ₹1,21,250
- Reactive energy charge
- ₹600
- Cost of 10 kVA more Maximum Demand
- ₹2,300
TNERC Tariff Order 6 of 2025 · LT-IIIB industries, TNPDCL
Bill before FPPAS and duty₹2,35,950₹9.44 per kWh
- Fixed charge rate
- ₹165 per kW
- Fixed charge
- ₹16,500
- Excess demand charge
- ₹0
- Energy charge
- ₹2,06,250
- Peak-hour surcharge (25%)
- ₹14,438
- Night rebate (5%)
- −₹1,238
- Power factor compensation
- ₹0
- Cost of 10 kW more Maximum Demand
- ₹4,719
MERC 2026-27 · HT I(A) industry, MSEDCL
Bill before ZFAC and duty₹10,41,520₹11.57 per kVAh · ₹10,31,105 if paid within 7 days
- Billable demand
- 380 kVA
- Demand charge (₹650 per kVA)
- ₹2,47,000
- Demand above Contract Demand (150% extra)
- ₹0
- Energy charge (₹8.44 per kVAh)
- ₹7,59,600
- Wheeling charge
- ₹72,900
- Peak-hour charge (25%)
- ₹46,420
- Solar-hours rebate
- −₹84,400
- Load factor
- 31%
- Load factor incentive
- ₹0
- Prompt payment discount (1%)
- −₹10,415
- Paid within 7 days
- ₹10,31,105
- Cost of 10 kVA more Maximum Demand
- ₹6,500
MERC 2026-27 · LT V industry above 20 kW, MSEDCL
Bill before ZFAC and duty₹1,81,335₹10.07 per kVAh · ₹1,79,522 if paid within 7 days
- Billable demand
- 52 kVA (65% of MD)
- Demand charge (₹420 per kVA)
- ₹21,840
- Demand above Contract Demand (150% extra)
- ₹0
- Energy charge (₹7.66 per kVAh)
- ₹1,37,880
- Wheeling charge (₹1.52 per kVAh)
- ₹27,360
- Peak-hour charge (25%)
- ₹7,660
- Solar-hours rebate
- −₹13,405
- Prompt payment discount (1%)
- −₹1,813
- Paid within 7 days
- ₹1,79,522
- Cost of 10 kVA more Maximum Demand
- ₹2,730
RERC 2026-27 · HT-5 large industry, JVVNL, AVVNL, JdVVNL
Bill before electricity duty and cess₹12,74,145₹8.49 per kWh · ₹3,898 back in the next bill if paid 10 days early
- Billing demand
- 380 kVA
- Fixed charge (₹380 per kVA)
- ₹1,44,400
- Excess demand charge
- ₹0
- Energy charge (₹6.50 per kWh)
- ₹9,75,000
- Voltage rebate
- ₹0
- Morning peak (5%)
- ₹3,250
- Evening peak (10%)
- ₹16,250
- Noon rebate (10%)
- −₹19,500
- Load factor
- 52%
- Load factor rebate (₹0.15 per kWh above 50%)
- −₹900
- Power factor surcharge or incentive
- −₹4,870 (0.5%)
- Top-up to the ₹6.00 minimum
- ₹0
- Regulatory surcharge (₹1.00 per kWh)
- ₹1,50,000
- Special fuel surcharge (7.01 paise per kWh)
- ₹10,515
- Cost of 10 kVA more Maximum Demand
- ₹3,800
RERC 2026-27 · LT-6 medium industry, JVVNL, AVVNL, JdVVNL
Bill before electricity duty and cess₹1,28,552₹8.57 per kWh · ₹394 back in the next bill if paid 10 days early
- Billing demand
- —
- Fixed charge (₹150 per HP)(₹275 per kVA)
- ₹15,000
- Excess demand charge
- ₹0
- Energy charge (₹6.50 per kWh)
- ₹97,500
- Morning peak (5%)
- ₹325
- Evening peak (10%)
- ₹1,625
- Noon rebate (10%)
- −₹1,950
- Power factor surcharge or incentive
- ₹0
- Regulatory surcharge (₹1.00 per kWh)
- ₹15,000
- Special fuel surcharge (7.01 paise per kWh)
- ₹1,052
- Cost of 10 kVA more Maximum Demand
- ₹0
MPERC 2026-27 · HV-3.1 industrial, MP West, Central and East DISCOMs
Bill before electricity duty and cess₹13,29,093₹8.86 per kWh · ₹13,25,770 if paid 7 days early
- Billing demand
- 380 kVA
- Fixed charge rate
- ₹641 per kVA
- Fixed charge
- ₹2,43,580
- Excess demand charge
- ₹0
- Load factor
- 54%
- Energy charge (two rates around 50% load factor)
- ₹11,50,152
- Peak-hour surcharge (20%)
- ₹69,009
- Solar-hour rebate (20%)
- −₹99,680
- Night rebate
- −₹23,003
- Power factor penalty or incentive
- −₹10,965 (1%)
- Monthly minimum units
- 40,000 kWh
- Cost of 10 kVA more Maximum Demand
- ₹6,410
MPERC 2026-27 · LV-4 LT industrial, MP West, Central and East DISCOMs
Bill before electricity duty and cess₹93,646₹7.80 per kWh · ₹93,178 if paid 7 days early
- Billing demand
- 45 kW
- Fixed charge rate
- ₹336 per kW
- Fixed charge
- ₹15,120
- Excess demand charge
- ₹0
- Energy charge (₹7.05 per kWh)
- ₹84,600
- Peak-hour surcharge (20%)
- ₹5,640
- Solar-hour rebate (20%)
- −₹7,050
- Load factor
- 33%
- Load factor concession
- −₹504
- Power factor surcharge or incentive
- −₹4,160 (5%)
- Cost of 10 kW more Maximum Demand
- ₹3,360
DERC tariff schedule · Industrial at HT, BRPL, BYPL, Tata Power-DDL and NDMC
Bill before electricity tax₹15,06,340₹10.04 per kVAh
- Billing demand
- 400 kVA (sanctioned load)
- Fixed charge (₹250 per kVA)
- ₹1,00,000
- Surcharge on demand above sanctioned load (30%)
- ₹0
- Energy charge (₹7.75 per kVAh)
- ₹11,62,500
- Peak-hour surcharge (20%)
- ₹46,500
- Off-peak rebate (20%)
- −₹69,750
- HT rebate on energy charges
- −₹34,178
- PPAC and FPPAS
- ₹1,20,507
- 8% surcharge
- ₹96,406
- Pension trust surcharge
- ₹84,355
- Cost of 10 kVA more Maximum Demand
- ₹0 (within sanctioned load)
Billing demand is the full sanctioned load: the 20 kVA you did not use costs ₹6,250 this month.
DERC tariff schedule · Industrial at LT, BRPL, BYPL, Tata Power-DDL and NDMC
Bill before electricity tax₹2,71,500₹10.86 per kVAh
- Billing demand
- 100 kVA (sanctioned load)
- Fixed charge (₹250 per kVA)
- ₹25,000
- Surcharge on demand above sanctioned load (30%)
- ₹0
- Energy charge (₹7.75 per kVAh)
- ₹1,93,750
- Peak-hour surcharge (20%)
- ₹7,750
- Off-peak rebate (20%)
- −₹9,300
- PPAC and FPPAS
- ₹21,720
- 8% surcharge
- ₹17,376
- Pension trust surcharge
- ₹15,204
- Cost of 10 kVA more Maximum Demand
- ₹0 (within sanctioned load)
Billing demand is the full sanctioned load: the 10 kVA you did not use costs ₹3,125 this month.
KERC Tariff Order 2025 · HT-2(a) industries, BESCOM, CESC, HESCOM, GESCOM and MESCOM
Bill before electricity tax₹13,05,000₹8.70 per kWh
- Billing demand
- 470 kVA
- Demand charge (₹350 per kVA)
- ₹1,64,500
- Demand above Contract Demand (two times the rate)
- ₹0
- Energy charge (₹6.60 per kWh)
- ₹9,90,000
- Peak-hour charge (₹1 per unit)
- ₹45,000
- Night rebate (₹1 per unit)
- −₹40,000
- High-voltage rebate
- ₹0
- Power factor surcharge
- ₹9,000 (6 paise per unit)
- FPPCA
- ₹0
- Pension and gratuity charge
- ₹52,500
- FY25 true-up charge
- ₹84,000
- Cost of 10 kVA more Maximum Demand
- ₹3,500
Power factor 0.88 is below 0.90: the surcharge is 6 paise on every unit.
KERC Tariff Order 2025 · LT-5 industries, BESCOM, CESC, HESCOM, GESCOM and MESCOM
Bill before electricity tax₹1,54,750₹6.19 per kWh
- Billing demand
- 100 kW (sanctioned load)
- Fixed charge (₹200 per kW₹150 per HP)
- ₹20,000
- Demand above sanctioned load (two times the rate)
- ₹0
- Energy charge (₹4.40 per kWh)
- ₹1,10,000
- Peak-hour charge (₹1 per unit)
- ₹7,000
- Night rebate (₹1 per unit)
- −₹5,000
- Power factor surcharge
- ₹0
- FPPCA
- ₹0
- Pension and gratuity charge
- ₹8,750
- FY25 true-up charge
- ₹14,000
- Cost of 10 kW more Maximum Demand
- ₹0 (within sanctioned load)
Billing demand is the sanctioned load: the 10 kW you did not use costs ₹2,000 this month.
HERC tariff schedule FY 2026-27 · HT supply, UHBVN and DHBVN
Bill before electricity duty₹12,58,000₹8.39 per kVAh
- Maximum Demand
- 94% of Contract Demand
- Fixed charge (₹290 per kVA of Contract Demand)
- ₹1,45,000
- Energy charge
- ₹10,42,500 (₹6.95 per kVAh)
- Prepaid rebate (5%)
- ₹0
- Surcharge for Maximum Demand above 110% of Contract Demand
- ₹0
- FPPAS
- ₹70,500
- Cost of 10 kVA more Maximum Demand
- ₹0 (up to 110% of Contract Demand)
Maximum Demand can go up to 550 kVA, 110% of Contract Demand, before a 20% surcharge on the fixed and energy charges.
HERC tariff schedule FY 2026-27 · LT supply up to 50 kW, UHBVN and DHBVN
Bill before electricity duty₹66,560₹8.32 per kVAh
- Load band
- Above 20 kW, up to 50 kW
- Fixed charge rate
- ₹250 per kW
- Fixed charge
- ₹10,000
- Energy charge
- ₹52,800 (₹6.60 per kVAh)
- Prepaid rebate (5%)
- ₹0
- FPPAS
- ₹3,760
PSERC tariff schedule FY 2026-27 · Large Supply industry above 100 kVA, PSPCL
Bill before electricity duty₹9,67,700₹6.45 per kVAh
- Category
- General industry, up to 1,000 kVA
- Billing demand
- 470 kVA (Maximum Demand)
- Fixed charge
- ₹98,700 (₹210 per kVA)
- Surcharge on demand above Contract Demand (₹750 per kVA)
- ₹0
- Energy charge
- ₹8,85,000 (₹5.90 per kVAh)
- Peak-hour surcharge (₹2 per kVAh)
- ₹0 (16 June – 15 October only)
- Night rebate
- −₹16,000 (₹0.40 per kVAh)
- Voltage rebate on energy charges
- ₹0
- FPPAS
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹2,100 (fixed charge)
Maximum Demand can go up to 500 kVA, the full Contract Demand, before a surcharge of ₹750 per kVA.
PSERC tariff schedule FY 2026-27 · Small Power and Medium Supply industry up to 100 kVA, PSPCL
Bill before electricity duty₹95,820₹6.39 per kVAh
- Category
- Medium Supply, above 50 kVA
- Billing demand
- 72 kVA (Maximum Demand)
- Fixed charge
- ₹9,360 (₹130 per kVA)
- Surcharge on demand above Contract Demand (₹750 per kVA)
- ₹0
- Energy charge
- ₹87,450 (₹5.83 per kVAh)
- Peak-hour surcharge (₹2 per kVAh)
- ₹0 (16 June – 15 October only)
- Night rebate
- −₹990 (₹0.33 per kVAh)
- Voltage rebate on energy charges
- ₹0
- FPPAS
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹2,540 (fixed charge and ₹750 per kVA surcharge)
Maximum Demand can go up to 80 kVA, the full Contract Demand, before a surcharge of ₹750 per kVA.
TGERC retail supply tariff FY 2026-27 · HT-I(A) industry, TGSPDCL and TGNPDCL
Bill before electricity duty₹14,09,500₹9.40 per kVAh
- Category
- Industry general, 11 kV
- Billing demand
- 470 kVA (Maximum Demand)
- Demand charge
- ₹2,35,000 (₹500 per kVA)
- Demand above Contract Demand (two times the rate)
- ₹0
- Energy charge
- ₹11,47,500 (₹7.65 per kVAh)
- Extra energy charge above 120% of Contract Demand
- ₹0
- Peak-hour charge (₹1.50 per kVAh)
- ₹60,000
- Day rebate (₹0.50 per kVAh)
- −₹35,000
- Customer charge
- ₹2,000
- FSA
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹5,000 (demand charge)
Maximum Demand can go up to 500 kVA, the full Contract Demand, before demand is billed at two times the rate.
TGERC retail supply tariff FY 2026-27 · LT-III industry up to 75 kW, TGSPDCL and TGNPDCL
Bill before electricity duty₹99,600₹8.30 per unit
- Load in HP
- 80 HP
- Fixed charge
- ₹6,000 (₹100 per kW)
- Energy charge
- ₹92,400 (₹7.70 per unit)
- Customer charge
- ₹1,200
- FSA
- ₹0
- Cost of 10 kW more contracted load
- ₹1,000
The fixed charge is on contracted load, used or not: each kW costs ₹100 a month.
APERC retail supply tariff FY 2026-27 · HT III(A) industry general, APEPDCL, APCPDCL and APSPDCL
Bill before electricity duty₹11,77,156₹7.85 per kVAh
- Supply
- 11 kV, high-demand months
- Billing demand
- 470 kVA (Maximum Demand)
- Demand charge
- ₹2,23,250 (₹475 per kVA)
- Demand above Contract Demand (two times the rate)
- ₹0
- Peak-hour energy
- ₹3,12,000 (₹7.80 per kVAh)
- Normal-hour energy (3 – 6 pm, 10 pm – midnight)
- ₹2,52,000 (₹6.30 per kVAh)
- Off-peak energy
- ₹3,88,500 (₹5.55 per kVAh)
- Minimum energy shortfall
- ₹0
- Extra on excess energy above 120% of Contract Demand
- ₹0
- Customer charge
- ₹1,406
- FPPCA
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹4,750 (demand charge)
Each kVAh moved from peak hours to off-peak hours saves ₹2.25 at 11 kV in these months.
APERC retail supply tariff FY 2026-27 · LT III(A) industry general up to 150 kW, APEPDCL, APCPDCL and APSPDCL
Bill before electricity duty₹84,338₹7.03 per unit
- Load in HP
- 80 HP
- Fixed charge
- ₹4,500 (₹75 per kW)
- Peak-hour energy
- ₹19,250 (₹7.70 per unit)
- Normal-hour energy
- ₹36,850 (₹6.70 per unit)
- Off-peak energy
- ₹22,800 (₹5.70 per unit)
- Customer charge
- ₹938
- FPPCA
- ₹0
- Cost of 10 kW more contracted load
- ₹750
Each unit moved from 6 – 10 pm to 10 am – 3 pm saves ₹2.00.
WBERC tariff order for 2025-26, in force until further order · WBSEDCL HV industry, Rates E(B), F(B), H(B), I(BT)
Bill before electricity duty₹11,51,130₹8.53 per kWh
- Supply
- 11 kV, winter, flat rate
- Billing demand
- 470 kVA (Maximum Demand)
- Demand charge
- ₹1,80,480 (₹384 per kVA)
- Additional demand charge above Contract Demand
- ₹0
- Energy charge
- ₹9,51,750 (₹7.05 per kWh)
- Normal-hour energy, 6 am – 5 pm
- ₹5,19,750 (₹6.93 per kWh)
- Peak-hour energy, 5 – 11 pm
- ₹2,50,500 (₹8.35 per kWh)
- Off-peak energy, 11 pm – 6 am
- ₹1,54,800 (₹5.16 per kWh)
- Load factor adjustment
- ₹18,900 (load factor 44.3%, 14 paise per kWh surcharge)
- Power factor adjustment
- ₹0 (no adjustment)
- MVCA
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹3,840 (demand charge)
Load factor is 44.3%: a surcharge of 14 paise per kWh. Above 70% it turns into a rebate, if the bill is paid on time.
WBERC tariff order for 2025-26, in force until further order · WBSEDCL LT industry, Rates B(I-U), B(I-R), B(I)T, B-IDI
Bill before electricity duty₹64,385₹8.05 per kWh
- Supply
- Below 50 kVA, urban
- Fixed or demand charge
- ₹3,000 (₹75 per kVA)
- Energy charge
- ₹61,385
- Normal-hour energy, 6 am – 5 pm
- ₹29,970 (₹6.66 per kWh)
- Peak-hour energy, 5 – 11 pm
- ₹12,015 (₹8.01 per kWh)
- Off-peak energy, 11 pm – 6 am
- ₹9,960 (₹4.98 per kWh)
- MVCA
- ₹0
Slabs are monthly: the first units are the cheapest.
WBERC tariff order for 2025-26, in force until further order · CESC Limited HV industry, Rates A and A1
Bill before electricity duty₹10,93,080₹8.10 per kWh
- Supply
- Below 33 kV, winter, flat rate
- Billing demand
- 470 kVA (Maximum Demand)
- Demand charge
- ₹1,80,480 (₹384 per kVA)
- Additional demand charge above Contract Demand
- ₹0
- Energy charge
- ₹9,12,600 (₹6.76 per kWh)
- Normal-hour energy, 6 am – 5 pm
- ₹4,95,750 (₹6.61 per kWh)
- Peak-hour energy, 5 – 11 pm
- ₹2,93,100 (₹9.77 per kWh)
- Off-peak energy, 11 pm – 6 am
- ₹1,39,500 (₹4.65 per kWh)
- Load factor and power factor adjustment
- ₹0
- MVCA
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹3,840 (demand charge)
CESC’s load factor and power factor terms continue from its 2024-25 order. Enter that line from your bill.
WBERC tariff order for 2025-26, in force until further order · CESC Limited LT industry, Rate K
Bill before electricity duty₹64,710₹8.09 per kWh
- Supply
- Rate K, industries (urban)
- Fixed or demand charge
- ₹2,000 (₹50 per kVA)
- Energy charge
- ₹62,710
- Normal-hour energy, 6 am – 5 pm
- ₹35,505 (₹7.89 per kWh)
- Peak-hour energy, 5 – 11 pm
- ₹17,535 (₹11.69 per kWh)
- Off-peak energy, 11 pm – 6 am
- ₹11,060 (₹5.53 per kWh)
- MVCA
- ₹0
Slabs are monthly: the first units are the cheapest.
OERC retail supply tariff FY 2026-27 · Large Industry and HT Industrial (M), TPCODL, TPNODL, TPWODL and TPSODL
Bill before electricity duty₹9,68,925₹6.46 per kVAh
- Supply
- HT, Large Industry
- Billing demand
- 470 kVA (Peak-hour demand)
- Demand charge
- ₹1,17,500 (₹250 per kVA)
- Overdrawal penalty
- ₹0
- Load factor
- 44.3%
- Energy charge
- ₹8,77,500 (₹5.85 per kVAh)
- Solar-hour change
- −₹43,875 (10% less)
- Peak-hour change
- ₹17,550 (10% more)
- EHT rebate above 80% load factor
- ₹0
- Customer service charge
- ₹250
- Cost of 10 kVA more demand in Peak hours
- ₹2,500 (demand charge)
Load factor is 44.3%. Units above 60% load factor drop to ₹4.75 per kVAh.
OERC retail supply tariff FY 2026-27 · LT Industrial (S), LT Industrial (M) and Large Industry LT
Bill before electricity duty₹52,820₹6.60 per kWh
- Category
- LT Industrial (M), 22 to below 110 kVA
- Fixed or demand charge
- ₹3,220 (₹100 first kVA, ₹80 each further kVA)
- Customer service charge
- ₹0
- Energy charge
- ₹49,600 (₹6.20 per kWh)
- Rebate
- ₹0
Rebates need the bill paid by the due date.
CSERC tariff order FY 2026-27 · CSPDCL HV-3 industry and HV-4 steel
Bill before electricity duty, to the nearest ₹10₹12,94,850₹8.63 per kVAh
- Supply
- 11 kV, HV-3 industry
- Billing demand
- 470 kVA (Maximum Demand)
- Demand charge
- ₹1,88,000 (₹400 per kVA)
- Excess demand charge
- ₹0
- Energy charge
- ₹11,06,850 (₹7.85 normal, 80% solar, 120% peak)
- Energy on excess units
- ₹0
- Steel load factor rebate
- ₹0
- FPPAS
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹4,000 (demand charge)
Each kVAh moved from 5 – 11 pm to 9 am – 5 pm saves ₹3.14 at 11 kV.
CSERC tariff order FY 2026-27 · CSPDCL LV-5 industry
Bill before electricity duty₹70,331₹7.81 per kWh
- Supply
- Other industry above 18.7 kW
- Billing demand
- 45 kW
- Demand charge
- ₹6,750 (₹150 per kW)
- Excess demand charge
- ₹0
- Energy charge
- ₹63,900 (₹7.10 per kWh)
- Energy on excess units
- ₹0
- Power factor adjustment
- −₹319 (0.5% incentive)
- FPPAS
- ₹0
- Cost of 1 kW more Maximum Demand
- ₹150
Power factor from 0.90 up earns an incentive, up to 5% at 0.99.
JSERC tariff order FY 2026-27 · JBVNL HTS and HTSS
Bill before electricity duty₹11,48,000₹7.65 per kVAh
- Supply
- HTS
- Billing demand
- 470 kVA (Maximum Demand)
- Demand charge
- ₹1,88,000 (₹400 per kVA)
- Demand above Contract Demand at 1.5 times
- ₹0
- Energy charge
- ₹9,60,000 (₹6.40 per kVAh)
- Voltage rebate
- ₹0
- Load factor rebate, our estimate
- ₹0 (load factor 44.3%)
- FPPCA
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹4,000 (demand charge)
Load factor is 44.3%. Above 65% it earns a rebate on energy, up to 15%.
JSERC tariff order FY 2026-27 · JBVNL LTIS
Bill before electricity duty₹1,09,500₹7.30 per kVAh
- Supply
- LTIS
- Billing demand
- 70 kVA (Maximum Demand)
- Demand charge
- ₹10,500 (₹150 per kVA)
- Demand above Contract Demand at 1.5 times
- ₹0
- Energy charge
- ₹99,000 (₹6.60 per kVAh)
- FPPCA
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹1,500 (demand charge)
Up to 110% of Contract Demand there is no penalty.
UERC tariff order FY 2026-27 · UPCL RTS-5 HT industry
Bill before electricity duty₹11,66,500₹7.78 per kVAh
- Supply
- RTS-5 HT, up to 1000 kVA
- Billing demand
- 470 kVA (Maximum Demand)
- Demand charge
- ₹1,92,700 (₹410 per kVA)
- Demand above Contract Demand at twice the rate
- ₹0
- Load factor
- 44.3%
- Energy charge
- ₹9,73,800 (₹6.85 normal, ₹8.91 peak, ₹5.31 solar)
- Voltage rebate or extra
- ₹0
- FPPCA
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹4,100 (demand charge)
Load factor is 44.3%. Above 50% the whole month’s energy rate falls, from ₹6.85 to ₹6.60 at normal hours.
UERC tariff order FY 2026-27 · UPCL RTS-5 LT industry
Bill before electricity duty₹78,400₹6.53 per kVAh
- Supply
- RTS-5 LT, time of day
- Demand charge
- ₹11,100 (₹185 per kVA)
- Demand above contracted load
- ₹0
- Energy charge
- ₹67,300 (₹5.75 normal, ₹7.48 peak, ₹4.46 solar)
- FPPCA
- ₹0
Above 25 kW, LT supply is subject to time of day.
HPERC tariff order FY 2026-27 · HPSEBL Large Industrial Power Supply
Bill before electricity duty₹10,19,200₹6.79 per kVAh
- Supply
- HT-1, up to 1 MVA
- Billing demand
- 470 kVA (Maximum Demand)
- Demand charge
- ₹1,17,500 (₹250 per kVA)
- Contract Demand violation charge
- ₹0
- Energy charge, other hours
- ₹7,48,800 (₹5.85 per kVAh)
- Energy charge, peak load hours
- ₹1,52,900 (₹6.95 per kVAh)
- FPPAS
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹2,500 (demand charge)
Each kVAh moved out of 6:30 – 10 pm saves ₹1.10.
HPERC tariff order FY 2026-27 · HPSEBL Small and Medium Industrial Power Supply
Bill before electricity duty₹49,700₹6.21 per kVAh
- Supply
- SIP, two part
- Billing demand
- 36 kVA (Maximum Demand)
- Fixed or demand charge
- ₹3,600 (₹100 per kVA)
- Contract Demand violation charge
- ₹0
- Energy charge, other hours
- ₹39,200 (₹5.60 per kVAh)
- Energy charge, peak load hours
- ₹6,900 (₹6.90 per kVAh)
- FPPAS
- ₹0
- Cost of 10 kVA more Maximum Demand
- ₹2,200 (three times the rate above Contract Demand)
Each kVAh moved out of 6:30 – 10 pm saves ₹1.30.
Illustrative defaults — replace them with your own bill. FPPAS, electricity duty, arrears and the green energy tariff are not included. The due-date rebate is worked out on the demand, energy and TOD charges, not on the excess-demand charge.
Illustrative defaults — replace them with your own bill. Rates are from the GERC HTP-I schedule for PGVCL, DGVCL, MGVCL and UGVCL effective 1 April 2026. FPPAS, electricity duty and taxes are not included. Each 1% of power factor, or part of it, counts as a step.
Illustrative defaults — replace them with your own bill. Rates are from the GERC HTMD-1 schedule for Torrent Power Ahmedabad–Gandhinagar effective 1 April 2026; demand is in kW. FPPAS, electricity duty and taxes are not included. The power factor adjustment is worked in whole 1% steps, in paise on every unit.
Illustrative defaults — replace them with your own bill. Rates are from the GERC HTMD-I schedule for Torrent Power Surat effective 1 April 2026. FPPAS, electricity duty and taxes are not included. Each 1% of power factor, or part of it, counts as a step.
Illustrative defaults — replace them with your own bill. Rates are from TNERC Tariff Order 6 of 2025 for HT-I industries. Electricity tax and other levies are not included. Power factor compensation is worked out here on the demand, energy and TOD charges.
Illustrative defaults — replace them with your own bill. Rates are the UPERC 2026-27 LMV-6 urban rates for kVAh billing (10 kW and above). FPPAS, electricity duty and arrears are not included. The due-date rebate is worked out on the demand, energy and TOD charges, not on the excess-demand charge.
Illustrative defaults — replace them with your own bill. Rates are from the GERC LTMD schedule for PGVCL, DGVCL, MGVCL and UGVCL effective 1 April 2026, post-paid. The peak-hour charge and the 11 am – 5 pm rebate apply only with a ToD or smart meter; enter 0 for those units otherwise. FPPAS, electricity duty and taxes are not included.
Illustrative defaults — replace them with your own bill. Rates are from the GERC LTMD-2 schedule for Torrent Power Ahmedabad–Gandhinagar effective 1 April 2026, for Contract Demand up to 150 kW. LTMD-2 has no peak-hour charge; its power factor terms are the same as HTMD-1. FPPAS, electricity duty and taxes are not included.
Illustrative defaults — replace them with your own bill. Rates are from the GERC LTMD schedule for Torrent Power Surat effective 1 April 2026, for Contract Demand up to 150 kVA. The reactive energy charge applies from 40 kVA of Contract Demand. FPPAS, electricity duty and taxes are not included.
Illustrative defaults — replace them with your own bill. Rates are from TNERC Tariff Order 6 of 2025 for LT-IIIB industries. The excess demand charge shown is for the first occurrence in 12 months; later ones are charged more. Industries up to 50 kW may still be billed the earlier ₹81 and ₹8.00. Electricity tax is not included. Power factor compensation is worked out here on the fixed, energy and TOD charges.
Illustrative defaults — replace them with your own bill. Rates are MERC’s FY 2026-27 HT I(A) rates for MSEDCL (Case 75 of 2025, 25 March 2026), which also apply in Torrent Power’s Bhiwandi and Shil-Mumbra-Kalwa franchise areas. ZFAC, electricity duty, tax on sale of electricity and the bulk, incremental and single-shift concessions are not included. Billing demand uses the 75% of Contract Demand floor; if 75% of your highest billing demand in the last 11 months is higher, the bill uses that. Load factor is worked on a 30-day month without interruptions, in whole points, and the incentive on the energy charge.
Illustrative defaults — replace them with your own bill. Rates are MERC’s FY 2026-27 LT V industry rates for MSEDCL above 20 kW. ZFAC, electricity duty, tax on sale of electricity, the incremental consumption rebate and the 0.25% digital payment discount are not included. Above Contract Demand, the calculator bills the recorded demand plus 150% extra on the excess, as the tariff schedule’s penalty clause reads.
Illustrative defaults — replace them with your own bill. Rates are RERC’s FY 2026-27 HT-5 large industry rates for JVVNL, AVVNL and JdVVNL (order of 30 March 2026), with the schedule terms of the 2025 tariff that the order keeps. Franchise areas such as Kota, Bharatpur, Bikaner and Ajmer use the same tariff. Electricity duty, cesses and the incremental and new-connection rebates are not included. Power factor is worked in 0.001 steps, as for CEA-compliant meters. The excess demand charge starts above 105% of Contract Demand; one half-hour a month up to 110%, and night drawal up to 120%, are not charged.
Illustrative defaults — replace them with your own bill. Rates are RERC’s FY 2026-27 LT-6 medium industry rates (25 to 150 HP) for JVVNL, AVVNL and JdVVNL. Demand billing follows the HT-3 rules: at least 75% of Contract Demand, and an excess demand charge above 105%. Electricity duty, cesses and the 15 paise prepaid rebate are not included. Power factor is worked in 0.001 steps, as for CEA-compliant meters.
Illustrative defaults — replace them with your own bill. Rates are MPERC’s FY 2026-27 HV-3.1 industrial rates for the West, Central and East DISCOMs (order of 26 March 2026); the Pithampur SEZ has its own order. FPPAS, electricity duty, cess and the incremental, new-connection and rural-feeder rebates are not included. Load factor is worked on a 30-day month without scheduled outages. Time-of-day charges are worked on the month’s average energy rate, and power factor in whole percent. Units below the monthly minimum are adjusted over the year, so the shortfall is not added here.
Illustrative defaults — replace them with your own bill. Rates are MPERC’s FY 2026-27 LV-4 LT industrial rates (demand-based tariff) for the West, Central and East DISCOMs. FPPAS, electricity duty and cess are not included. Up to 15 kW of Contract Demand, the fixed and energy charges are 30% lower in months the Maximum Demand stays within 15 kW. Load factor is worked on a 30-day month on the demand entered, and power factor in whole percent.
Illustrative defaults — replace them with your own bill. Rates are the DERC industrial tariff (₹250 per kVA a month, ₹7.75 per kVAh), set in the FY 2020-21 tariff schedule and still in force: later true-up orders have not changed it. PPAC and FPPAS change every month and differ by DISCOM; the default 10% is BRPL’s FPPAS for October 2026 bills. They are worked here on the fixed and energy charges. The 8% and pension trust surcharges are worked on the fixed and energy charges after time-of-day and the HT rebate, not on PPAC or the 30% surcharge. Electricity tax, late payment surcharge and the 1% prepaid rebate are not included.
Illustrative defaults — replace them with your own bill. Industrial supply at LT pays the same DERC rates as HT, without the HT rebate. Sanctioned load in kW is turned into kVA at the month’s power factor. PPAC and FPPAS change every month and differ by DISCOM; the default 10% is BRPL’s FPPAS for October 2026 bills. Electricity tax and the late payment surcharge are not included. Without a valid factory licence, the connection is billed as non-domestic at ₹8.50 per kVAh.
Illustrative defaults — replace them with your own bill. Rates are KERC’s FY 2026-27 HT-2(a) rates from Tariff Order 2025 for all ESCOMs (27 March 2025). The FY25 true-up charge is KERC’s figure for units used from 1 May 2026 to 30 April 2027; HRECS Hukkeri refunds 155 paise. FPPCA changes from month to month, so enter the figure on your bill. Billing demand is rounded to the whole kVA; demand above Contract Demand pays two times the normal rate, as the order’s deterrent charge reads. Time of day is compulsory from 500 kVA and is not applied to units under the discounted energy rate scheme. Electricity tax, interest on late payment and the 0.25% early payment incentive are not included.
Illustrative defaults — replace them with your own bill. Rates are KERC’s FY 2026-27 LT-5 industrial rates from Tariff Order 2025 for all ESCOMs. On the demand-based tariff, billing demand is the sanctioned load or the Maximum Demand, whichever is higher, and demand above the sanctioned load pays two times the normal rate. The power factor surcharge is 2 paise per unit for each 0.01 below 0.85, at most 30 paise. FPPCA changes from month to month, so enter the figure on your bill. Electricity tax and the 20 paise village panchayat rebate are not included.
Illustrative defaults — replace them with your own bill. Rates are HERC’s FY 2026-27 HT supply rates for UHBVN and DHBVN (tariff order of 25 March 2026, unchanged from 2025-26), which cover industry and non-domestic supply above 50 kW. The surcharge for Maximum Demand above Contract Demand is from the Supply Code amendment in force from 29 July 2026: none up to 110%, 20% above 110% and 25% above 115%. HERC levies it on the charges for the total sale of power in the month; it is worked here on the fixed and energy charges, so check how your bill applies it. FPPAS is 47 paise per unit as continued by the DISCOMs in June 2026. Electricity duty, municipal or panchayat tax and the late payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are HERC’s FY 2026-27 LT supply rates for UHBVN and DHBVN, by connected load: ₹6.45 per kVAh and ₹100 per kW up to 10 kW, ₹6.80 and ₹100 above 10 kW up to 20 kW, and ₹6.60 and ₹250 above 20 kW up to 50 kW. The fixed charge is per kW of connected load or part of it. FPPAS is 47 paise per unit as continued by the DISCOMs in June 2026. Electricity duty, municipal or panchayat tax and the late payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are PSERC’s FY 2026-27 Large Supply rates for PSPCL (tariff order of 6 March 2026, in force from 1 April 2026). The fixed charge is on the higher of 80% of Contract Demand and Maximum Demand, up to Contract Demand; demand above Contract Demand pays ₹750 per kVA. The night rebate cannot take the energy rate below ₹5.50 per kVAh. Supply below the voltage the Supply Code sets for your demand adds a voltage surcharge, not included here. The exclusive night-hours tariff, seasonal industry and cold storage rates are not covered. Electricity duty, infrastructure development fund and other levies are not included.
Illustrative defaults — replace them with your own bill. Rates are PSERC’s FY 2026-27 rates for PSPCL: Small Power up to 50 kVA at ₹100 per kVA and ₹5.70 per kVAh, Medium Supply above 50 kVA up to 100 kVA at ₹130 per kVA and ₹5.83 per kVAh. The fixed charge is on the higher of 80% of Contract Demand and Maximum Demand, up to Contract Demand; demand above Contract Demand pays ₹750 per kVA. Time of day applies to Medium Supply only, and the night rebate cannot take the energy rate below ₹5.50 per kVAh. Electricity duty, infrastructure development fund and other levies are not included.
Illustrative defaults — replace them with your own bill. Rates are TGERC’s FY 2026-27 HT-I(A) industry rates for TGSPDCL and TGNPDCL, in force from 1 April 2026. Billing demand is the higher of Maximum Demand and 80% of Contract Demand; demand above Contract Demand pays two times the normal rate, and above 120% of Contract Demand the energy charge on all units is 15% higher, 20% above 200%. Units below 50 kVAh per kVA of billing demand are billed as the minimum. The peak-hour charge and day rebate are added to the normal energy charge; 10 pm – 6 am is at the normal rate. The schedule lists time of day for industry general, not for the optional category, so none is applied to it. FSA changes over the year, so enter the figure on your bill. Electricity duty, the green tariff and the delayed payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are TGERC’s FY 2026-27 LT-III industry rates for TGSPDCL and TGNPDCL: ₹100 per kW of contracted load a month and ₹7.70 per unit, with a customer charge of ₹100 up to 20 HP, ₹350 from 21 to 50 HP and ₹1,200 from 51 to 125 HP. LT-III has no time-of-day tariff. Seasonal industries, poultry, pisciculture and other LT-III sub-categories have their own rates. Electricity duty and the 25% capacitor surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are APERC’s FY 2026-27 HT III(A) industry general rates for APEPDCL, APCPDCL and APSPDCL (retail supply tariff order, in force from 1 April 2026). Every unit is billed at its time-of-day rate; peak hours cost ₹0.50 more per kVAh from February to May and in September and October. Billing demand is the higher of Maximum Demand and 80% of Contract Demand; demand above Contract Demand pays two times the normal rate. Above 120% of Contract Demand, the excess share of energy (excess demand ÷ Maximum Demand × units) pays 1.5 times the rate, two times above 200%; the calculator works it at the month’s average energy rate. Units below 50 kVAh per kVA of billing demand are billed at the normal-hour rate. Supply below the voltage set for your Contract Demand adds a voltage surcharge, not included here. Industrial colony units at ₹7.00, seasonal and energy-intensive industries are not covered. FPPCA and true-up charges change over the year, so enter the figure on your bill. Electricity duty, the green tariff and the delayed payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are APERC’s FY 2026-27 LT III(A) industry general rates for APEPDCL, APCPDCL and APSPDCL. The fixed charge is ₹75 per kW, or kVA when billed in kVAh, on the higher of contracted load and recorded demand, rounded up to the whole kW; the order lists ₹275 for loads above 75 kW, worked here on the kW above 75 as its notes for other LT categories read. Up to 15 kW there is no time of day; above 15 kW, 6 – 10 pm and 10 am – 3 pm have their own rates. Customer charge is ₹63 up to 20 HP, ₹250 from 21 to 50 HP and ₹938 from 51 to 200 HP, with 1 HP taken as 0.75 kW. Above 37.5 kW, metering is on the HT side and 1% of units is deducted before billing; enter the billed units. Electricity duty and the delayed payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are WBERC’s 2025-26 rates for WBSEDCL HV industry (order of 20 March 2025, in force from 1 April 2025 until further order). The flat rate applies at 11, 33 and 132 kV and time of day is optional; at 220 kV time of day is the only rate. Billing demand is the higher of Maximum Demand and 85% of Contract Demand. Demand above Contract Demand adds to the normal ₹384: 60% on the flat rate; on time of day 20% in normal hours and 50% in peak hours, and 1%, 10% or 20% by band in off-peak hours. If demand crossed in more than one period, the highest charge applies, so try each. Load factor is kWh ÷ (hours × billing demand × power factor), and the load factor rebate needs the bill paid on time. Enter MVCA from your bill. Electricity duty, the on-time and e-payment rebates, the older additional load factor rebate at 33 and 132 kV and the 3% rebate at 400 kV are not included.
Illustrative defaults — replace them with your own bill. Rates are WBERC’s 2025-26 rates for WBSEDCL LT industry (in force until further order). Below 50 kVA: ₹75 per kVA and monthly slabs, urban or rural. From 50 kVA, Rate B-IDI: ₹270 per kVA and ₹6.92 per kWh. Time of day is optional. The kVA line is worked on Contract Demand. From 50 kVA, load factor and power factor adjustments and any additional demand charge also apply and are not included. Enter MVCA from your bill. Electricity duty and payment rebates are not included.
Illustrative defaults — replace them with your own bill. Rates are WBERC’s 2025-26 rates for CESC Limited, Rates A and A1 (order of 25 March 2025, in force from 1 April 2025 until further order). Time of day is optional. Billing demand and the additional demand charge follow the same regulations as WBSEDCL. CESC’s order does not print load factor or power factor tables and says the other terms of its 2024-25 order continue, so enter that adjustment from your bill. Enter MVCA from your bill. Electricity duty, payment rebates and supply above 33 kV are not included.
Illustrative defaults — replace them with your own bill. Rates are WBERC’s 2025-26 rates for CESC Limited, Rate K (in force until further order): ₹50 per kVA on Contract Demand and monthly slabs, or optional Rate K(TOD) at ₹7.89, ₹11.69 and ₹5.53. Enter MVCA from your bill. Any load factor or power factor line on your bill, electricity duty and payment rebates are not included.
Illustrative defaults — replace them with your own bill. Rates are OERC’s FY 2026-27 rates for TPCODL, TPNODL, TPWODL and TPSODL (order of 24 March 2026). Energy is in kVAh: units up to the 60% load factor point are at the first rate, the rest at the second, with load factor as kVAh ÷ (highest demand × hours). Enter hours as your bill counts them. Solar and Peak changes apply from 1 July 2026 and are worked at the month’s average energy rate. Demand and penalty follow the rule for three-part tariff above 110 kVA, from 1 July 2026 after your meter is configured; until then your bill follows the highest demand or 80% of Contract Demand. Enter the highest demand of the financial year for HT Industrial (M). Electricity duty, meter rent, the 1% prompt payment and 4% prepaid rebates, the steel load factor rebate and the 33 kV double-demand agreement are not included.
Illustrative defaults — replace them with your own bill. Rates are OERC’s FY 2026-27 rates: ₹6.20 per kWh on all three categories. LT Industrial (S), below 22 kVA, pays ₹80 for the first kVA and ₹35 for each further kVA. LT Industrial (M), 22 to below 110 kVA, pays ₹100 and ₹80. Large Industry LT, from 110 kVA, pays ₹200 per kVA on the higher of recorded demand and 80% of Contract Demand, and ₹30 customer service. Below 110 kVA, recorded demand rounded to the nearest 0.5 kW counts as Contract Demand. Enter the highest demand of the financial year. The rebates need the bill paid by the due date. Electricity duty, meter rent and the prepaid rebate are not included.
Illustrative defaults — replace them with your own bill. Rates are CSERC’s FY 2026-27 rates for CSPDCL (order of 15 June 2026, revised tariff from 1 July 2026), for load factor above 15%, or 35% for rolling mills. The low load factor rate, the 5% poha and murmura discount and the 5% extra above the Contract Demand limit for your voltage are not included. Billing demand is the higher of Maximum Demand and 85% of Contract Demand, rounded up. Excess supply bills demand and excess units, units × (1 − Contract Demand ÷ Maximum Demand), at 1.5 times; we read 2 times as a tier on the part beyond 20% of Contract Demand, so check how your bill applies it. Steel: enter load factor from your bill; the rebate is on billed energy, not on FPPAS or excess energy. Bills are rounded to the nearest ₹10. Enter FPPAS from your bill. Electricity duty and the delayed payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are CSERC’s FY 2026-27 LV-5 rates for CSPDCL, up to 150 kW. Billing demand is the higher of Maximum Demand and 85% of Contract Demand, rounded up. Demand above Contract Demand and the excess units are billed at 1.5 times, and at 2 times beyond 20% of Contract Demand. Time of day is 95% off-peak and 105% peak, for supply above 10 kW with a smart meter. Power factor is on energy against a target of 0.90. Enter FPPAS from your bill. The 5% rural rebate, the 75 paise welding charge, electricity duty and the delayed payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are JSERC’s FY 2026-27 rates for JBVNL (order of 25 March 2026): HTS at ₹6.40 and HTSS at ₹5.80 per kVAh, ₹400 per kVA, with a floor of 75% of Contract Demand. Up to 110% of Contract Demand there is no penalty; above 110%, all demand above Contract Demand is at 1.5 times. Time of day is optional for HTS: 120% peak, 85% off-peak. The order does not print the load factor formula, so the rebate here is our estimate from kVAh ÷ (Maximum Demand × hours); it is not given when there are arrears. Enter FPPCA from your bill. HTIS, the capacitor surcharge, the fixed charge reduction for short supply hours, the prepaid rebate, electricity duty and the delayed payment surcharge are not included. DVC, Tata Steel UISL and SAIL Bokaro have their own orders.
Illustrative defaults — replace them with your own bill. Rates are JSERC’s FY 2026-27 LTIS rates for JBVNL, up to 100 kVA: ₹150 per kVA and ₹6.60 per kVAh, with a floor of 50% of Contract Demand. Up to 110% of Contract Demand there is no penalty; above 110%, all demand above Contract Demand is at 1.5 times. Enter FPPCA from your bill. The capacitor surcharge, the fixed charge reduction for short supply hours, electricity duty and the delayed payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are UERC’s FY 2026-27 RTS-5 HT rates for UPCL (order of 30 March 2026): ₹410 per kVA up to 1000 kVA, ₹480 above it. Billable demand is the higher of Maximum Demand and 75% of Contract Demand, and the excess above Contract Demand is at twice the rate for that month. Load factor is units ÷ (the lower of Maximum Demand and Contract Demand × hours); above 50%, the lower energy rates apply to the whole month. Voltage changes apply to contracted load above 75 kW. Enter FPPCA from your bill. The prompt payment rebate, electricity duty and the late payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are UERC’s FY 2026-27 RTS-5 LT rates for UPCL, up to 75 kW: ₹185 per kVA on contracted load and ₹5.75 per kVAh, with time of day above 25 kW. Recorded demand above contracted load is at twice the rate for that month; above 100 kVA, HT demand charges apply on all recorded demand for that month. Peak hours change with the season: 6 – 9 am and 6 – 10 pm from October to March, 6 – 11 pm from April to September. Enter FPPCA from your bill. The prompt payment rebate, electricity duty and the late payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are HPERC’s FY 2026-27 LIPS rates for HPSEBL (order of 25 March 2026), for Contract Demand above 100 kVA. Up to 33 kV, HT-1 applies up to 1 MVA and HT-2 above it. Billed demand is the higher of Maximum Demand on 30-minute blocks and 85% of Contract Demand, with Contract Demand as its ceiling, and the excess is charged at three times the rate. Enter FPPAS from your bill. The lower voltage supply and metering surcharges, the prepaid and new industry rebates, electricity duty and the late payment surcharge are not included.
Illustrative defaults — replace them with your own bill. Rates are HPERC’s FY 2026-27 rates for HPSEBL. MIP, above 50 and up to 100 kVA, pays ₹120 per kVA, ₹5.60 and ₹6.70 per kVAh. SIP, above 20 and up to 50 kVA, pays ₹100 per kVA, ₹5.60 and ₹6.90. Up to 20 kVA, SIP pays ₹155 a month and ₹5.71 per kWh, 1.35 times in peak hours, with a power factor surcharge not included here. The excess above Contract Demand is at three times the rate. Enter FPPAS from your bill. The lower voltage surcharges, the prepaid rebate, electricity duty and the late payment surcharge are not included.
Uttar Pradesh: HV-2 and LMV-6
The supply voltage buttons fill in the UPERC 2026-27 HV-2 urban rates: ₹300 per kVA and ₹7.10 per kVAh up to 11 kV, ₹290 and ₹6.80 up to 66 kV, ₹270 and ₹6.40 up to 132 kV, and ₹270 and ₹6.10 above 132 kV. On LT, LMV-6 is filled in at ₹261 per kVA and ₹6.57 per kVAh, the rates for kVAh billing at 10 kW and above. Both have TOD of +15% in peak hours and −15% off-peak and the 75% minimum. The UP electricity tariff guide lists the TOD hours and every other rule.
Gujarat and Torrent Power
Gujarat bills energy in kWh, not kVAh. For PGVCL, DGVCL, MGVCL and UGVCL (HTP-I) the calculator applies the GERC schedule from 1 April 2026: billing demand is the highest of Maximum Demand, 85% of contract demand and 100 kVA; the demand charge is ₹150, ₹260 and ₹475 per kVA in slabs, and ₹555 per kVA above contract demand; energy is 400 to 430 paise per unit by billing demand; peak hours (7–11 am, 6–10 pm) add 45 or 85 paise a unit, and units used between 11 am and 5 pm get 60 paise off. Power factor below 90% adds a share of the energy charge, and above 95% earns some back.
LTMD (LT) bills demand in kW: ₹90, ₹130 and ₹195 per kW in slabs, 460 paise per unit, the same peak charge and daytime concession with a ToD meter, and 10 paise per kVArh of reactive energy. Torrent Power Ahmedabad and Surat have their own HT schedules, with peak hours of 6–8 am and 5–11 pm and a 30 paise rebate on units used between 11 am and 3 pm, and LT schedules (LTMD-2 and LTMD) for Contract Demand up to 150 kW or kVA. The Gujarat tariff guide lists every rate.
Tamil Nadu: HT-I and LT-IIIB
HT-I is filled in at ₹608 per kVA and ₹7.50 per kWh. The demand charge is on the higher of Maximum Demand and 90% of Contract Demand, and the demand above Contract Demand is charged at double the rate. LT-IIIB charges ₹84, ₹165 or ₹608 per kW of contracted demand by band and ₹8.25 per kWh. Both add 25% on units used 6–10 am and 6–10 pm and take 5% off units used from 10 pm to 5 am, and both charge compensation for low power factor (below 0.90 on HT, 0.85 on LT). The Tamil Nadu tariff guide has the full rules.
Maharashtra: HT I(A) and LT V
MSEDCL HT I(A) is filled in at ₹650 per kVA and ₹8.44 per kVAh, plus a ₹0.81 per kVAh wheeling charge on HT supply (none on EHV). The demand charge is on the higher of Maximum Demand recorded between 6 am and 10 pm and 75% of Contract Demand, and the demand above Contract Demand is charged 150% extra. LT V industry above 20 kW pays ₹420 per kVA on the higher of 65% of Maximum Demand and 40% of Contract Demand, and ₹7.66 + ₹1.52 per kVAh. Both add 25% on units used from 5 pm to midnight and take 25% off units used from 9 am to 5 pm (15% from April to September). The Maharashtra tariff guide has the full rules.
Rajasthan: HT-5 and LT-6
HT-5 large industry (JVVNL, AVVNL, JdVVNL) is filled in at ₹380 per kVA and ₹6.50 per kWh, with 3%, 4% or 5% off the energy charge at 33, 132 or 220 kV. The fixed charge is on the higher of Maximum Demand and 75% of Contract Demand. Above 105% of Contract Demand, the whole fixed and energy charge goes up by the same percentage as the excess. Every connection above 10 kW adds 5% on units used 6–8 am and 10% on 6–10 pm, and takes 10% off units used 12–4 pm. A regulatory surcharge of ₹1.00 per unit and a special fuel surcharge of 7.01 paise are added. LT-6 (25 to 150 HP) pays ₹150 per HP or, if you choose demand billing, ₹275 per kVA. The Rajasthan tariff guide has the full rules.
Madhya Pradesh: HV-3.1 and LV-4
HV-3.1 industry (MP West, Central and East DISCOMs) is filled in at ₹641 per kVA at 33 kV, with ₹7.75 per kWh for units up to 50% load factor and ₹6.70 above it (other voltages set their own rates). The fixed charge is on the higher of Maximum Demand and 90% of Contract Demand. Demand up to 120% of Contract Demand is billed at the normal rate; from 120% to 130% it pays 1.3 times, above 130% double. Units used 6–9 am and 5–10 pm cost 20% more, 9 am–5 pm 20% less, and 10 pm–6 am 7.5% less (10% from June to September). Power factor below 0.90 adds a penalty and 0.96 or better earns an incentive. LV-4 LT industry pays ₹336 per kW or ₹269 per kVA in urban areas and ₹7.05 per kWh, with a load factor concession above 25%. The Madhya Pradesh tariff guide has the full rules.
Delhi: industrial, LT and HT
Industry and hospitals (BRPL, BYPL, Tata Power-DDL and NDMC) are filled in at ₹250 per kVA and ₹7.75 per kVAh, the same for LT and HT, with 3%, 4% or 5% off the energy charge at 11, 33 / 66 or 220 kV. The fixed charge is on the higher of the sanctioned load and Maximum Demand, and the kVA above the sanctioned load pays 30% extra. From May to September, units used 2–5 pm and 10 pm–1 am cost 20% more and 4–10 am 20% less; there is no ToD from October to April. BSES and Tata Power-DDL bills add an 8% surcharge and a 7% pension trust surcharge on the fixed and energy charges, and PPAC or FPPAS each month. The Delhi tariff guide has the full rules.
Karnataka: HT-2(a) and LT-5
Industries on all five ESCOMs (BESCOM, CESC Mysuru, HESCOM, GESCOM and MESCOM) are filled in at KERC’s 2026-27 rates: HT-2(a) at ₹350 per kVA and ₹6.60 per kWh, LT-5 at ₹150 per HP or, on the optional demand-based tariff, ₹200 per kW, with ₹4.40 per kWh. HT billing demand is the higher of Maximum Demand and 90% of Contract Demand, and the kVA above Contract Demand pays two times the rate. From December to June, units used 6–9 am and 6–10 pm cost ₹1 more and 10 pm–6 am ₹1 less; there is no ToD from July to November. Power factor below 0.90 on HT adds 3 paise per unit for each 0.01. Bills also carry the pension and gratuity charge, FPPCA and the FY25 true-up charge as paise per unit. The Karnataka tariff guide has the full rules.
Haryana: HT and LT supply
Industries on UHBVN and DHBVN are filled in at HERC’s 2026-27 rates, billed in kVAh. HT supply (above 50 kW) pays ₹290 per kVA of Contract Demand a month and ₹6.95 per kVAh at 11 kV, less at higher voltages. LT supply (up to 50 kW) pays by connected load: ₹100 per kW up to 20 kW and ₹250 per kW above, with ₹6.45 to ₹6.80 per kVAh. There is no time-of-day charge in 2026-27 and no separate power factor penalty, because kVAh already counts it. From 29 July 2026, an HT plant whose Maximum Demand goes above 110% of Contract Demand pays a 20% surcharge, and above 115% a 25% surcharge. Prepaid smart meters get 5% off the fixed and energy charges. The Haryana tariff guide has the full rules.
Punjab: Large Supply, Medium Supply and Small Power
Industries on PSPCL are filled in at PSERC’s 2026-27 rates, billed in kVAh: Large Supply (above 100 kVA) at ₹210 per kVA and ₹5.90 per kVAh up to 1,000 kVA, more for larger and power intensive units; Medium Supply (above 50 up to 100 kVA) at ₹130 and ₹5.83; Small Power (up to 50 kVA) at ₹100 and ₹5.70. The fixed charge is on the higher of 80% of Contract Demand and Maximum Demand, and every kVA above Contract Demand pays ₹750. From 16 June to 15 October, units used 6–10 pm cost ₹2 more; the rest of the year, units used 10 pm–6 am get up to ₹0.50 or ₹1 off, but not below ₹5.50 per kVAh. There is no separate power factor penalty, because kVAh already counts it. The Punjab tariff guide has the full rules.
Telangana: HT-I(A) and LT-III industry
Industries on TGSPDCL and TGNPDCL are filled in at TGERC’s 2026-27 rates. HT-I(A) industry pays ₹500 per kVA of billing demand a month and ₹7.65 per kVAh at 11 kV, ₹7.15 at 33 kV and ₹6.65 at 132 kV and above; plants up to 150 kVA at 11 kV can opt for ₹100 per kVA and ₹8.00. Billing demand is never below 80% of Contract Demand. Demand above Contract Demand pays two times the rate, and above 120% of it every unit’s energy charge goes up 15%. On industry general, units used 6–10 am and 6–10 pm cost ₹1.50 more, and 10 am–6 pm ₹0.50 less. LT-III industry up to 75 kW pays ₹100 per kW of contracted load and ₹7.70 per unit, with no time of day. HT energy is billed in kVAh, so there is no separate power factor penalty. The Telangana tariff guide has the full rules.
Andhra Pradesh: HT III(A) and LT III(A) industry
Industries on APEPDCL, APCPDCL and APSPDCL are filled in at APERC’s 2026-27 rates. HT III(A) industry pays ₹475 per kVA of billing demand a month, and every kVAh is billed by the hour it is used: at 11 kV, ₹7.80 in peak hours (6–10 am and 6–10 pm) from February to May and in September and October, ₹7.30 in the other months, ₹6.30 in normal hours and ₹5.55 off-peak (10 am–3 pm and midnight–6 am). Rates are lower at 33, 132 and 220 kV. Billing demand is never below 80% of Contract Demand, and demand above Contract Demand pays two times the rate. LT III(A) industry pays ₹75 per kW a month and ₹6.70 per unit, with peak and off-peak rates above 15 kW. Energy is billed in kVAh, so there is no separate power factor penalty. The Andhra Pradesh tariff guide has the full rules.
West Bengal WBSEDCL: HV and LT industry
WBSEDCL industries are filled in at WBERC’s 2025-26 rates, which continue until further order. HV industry pays ₹384 per kVA of billing demand a month and, at 11 kV, ₹7.05 to ₹7.07 per kWh by season, with optional time of day at ₹6.93 to ₹6.95, ₹8.35 to ₹8.37 from 5 to 11 pm and ₹5.16 to ₹5.18 from 11 pm to 6 am. Billing demand is never below 85% of Contract Demand. On the flat rate, demand above Contract Demand costs 60% more. Energy is in kWh, so power factor has its own line, and load factor adds a surcharge or rebate per kWh on all units. LT below 50 kVA pays ₹75 per kVA and monthly slabs; from 50 kVA, ₹270 per kVA and ₹6.92 per kWh. The West Bengal tariff guide has the full tables.
CESC Kolkata: Rates A, A1 and K
CESC has its own order, also the 2025-26 rates continuing until further order. HV industry pays ₹384 per kVA a month and ₹6.76 to ₹6.81 per kWh below 33 kV, ₹6.52 to ₹6.58 at 33 kV, by season. Time of day is optional, with a much dearer evening: ₹9.77 to ₹9.92 below 33 kV. CESC’s order does not print its load factor and power factor tables, so enter that line from your bill. LT Rate K pays ₹50 per kVA and slabs from ₹6.77 to ₹8.07 per kWh. The West Bengal tariff guide has the full tables.
Odisha: HT, EHT and LT industry
All four DISCOMs, TPCODL, TPNODL, TPWODL and TPSODL, share one tariff at OERC’s 2026-27 rates. HT Large Industry pays ₹250 per kVA a month, ₹250 customer service, and ₹5.85 per kVAh up to the 60% load factor point and ₹4.75 beyond it. From 1 July 2026, Solar hours (8 am to 4 pm) cost 10% less and Peak hours (6 pm to midnight) 10% more. On three-part tariff above 110 kVA, demand outside Peak hours can reach 120% of Contract Demand with no penalty, if Peak-hour demand stays within Contract Demand. LT is ₹6.20 per kWh. The Odisha tariff guide has the full rules.
Chhattisgarh: HV-3, HV-4 steel and LV-5
CSPDCL industries are filled in at CSERC’s 2026-27 rates, which apply from 1 July 2026. HV-3 at 11 kV pays ₹400 per kVA and ₹7.85 per kVAh; HV-4 steel pays ₹7.05, with a load factor rebate up to 25%. Solar hours (9 am to 5 pm) are 80% of the rate and peak hours (5 to 11 pm) 120%. Billing demand is never below 85% of Contract Demand. A crossing raises both demand and the excess share of units to 1.5 times, whatever the hour. The rate for load factor up to 15% is not in the calculator. LV-5 above 18.7 kW pays ₹150 per kW and ₹7.10 per kWh, with a power factor line. The Chhattisgarh tariff guide has the full rules.
Jharkhand: HTS, HTSS and LTIS
JBVNL industries are filled in at JSERC’s 2026-27 rates. HTS pays ₹400 per kVA and ₹6.40 per kVAh, HTSS for induction and arc furnaces ₹400 and ₹5.80, LTIS ₹150 and ₹6.60. Billing demand is never below 75% of Contract Demand at HT and 50% at LT. Up to 110% of Contract Demand there is no penalty, but above it all demand above Contract Demand goes to 1.5 times: a cliff. Energy is in kVAh, and load factor above 65% earns a rebate up to 15%. The Jharkhand tariff guide has the full rules.
Uttarakhand: RTS-5 HT and LT
UPCL industries are filled in at UERC’s 2026-27 rates. RTS-5 HT pays ₹410 per kVA up to 1000 kVA and ₹480 above it, and every kVAh is billed by the hour it is used: ₹6.85 normal, ₹8.91 peak and ₹5.31 solar, falling to ₹6.60, ₹8.58 and ₹5.12 for the whole month above 50% load factor. Billing demand is never below 75% of Contract Demand, and the excess above it pays twice the rate. RTS-5 LT pays ₹185 per kVA and ₹5.75 per kVAh. The Uttarakhand tariff guide has the full rules.
Himachal Pradesh: LIPS, MIP and SIP
HPSEBL industries are filled in at HPERC’s 2026-27 rates. LIPS HT-1, up to 1 MVA, pays ₹250 per kVA and ₹5.85 per kVAh, ₹6.95 from 6:30 to 10 pm. HT-2, above 1 MVA, pays ₹400 and ₹5.60. Billing demand is 85% of Contract Demand at the least and Contract Demand at the most, and the excess pays three times the rate. MIP pays ₹120 per kVA, SIP ₹100. The lower voltage surcharges of 2% to 8% on energy are not in the calculator. The Himachal Pradesh tariff guide has the full rules.
How a factory bill is built
- Billing demand = the higher of Maximum Demand and the minimum share of Contract Demand (75% in UP, on Rajasthan HT and on Maharashtra HT, 85% in Gujarat, 90% on Tamil Nadu HT, in Madhya Pradesh and on Karnataka HT; in Delhi it is the full sanctioned load, on Haryana HT the full Contract Demand, in Punjab 80%, with Maximum Demand counted up to Contract Demand, on Telangana HT 80%, on Andhra Pradesh HT 80%, in West Bengal, Chhattisgarh and on Himachal Pradesh LIPS 85%, on Himachal with Contract Demand as a ceiling, on Jharkhand HT and Uttarakhand HT 75%, and in Odisha 80%).
- Demand or fixed charge = billing demand × demand rate. Some schedules charge it in slabs.
- Excess-demand charge = demand above Contract Demand at a higher rate (2 times extra in UP, double rate on Tamil Nadu HT, 150% extra in Maharashtra, 30% extra on the fixed charge in Delhi, two times the rate in Karnataka; in Haryana a 20% or 25% surcharge on the whole fixed and energy charge above 110% of Contract Demand; in Punjab ₹750 per kVA above Contract Demand; on Telangana HT two times the rate, with all energy 15% dearer above 120%; on Andhra Pradesh HT two times the rate, with the excess share of energy at 1.5 times above 120%; in West Bengal 60% extra on the flat rate; in Chhattisgarh 1.5 times, on demand and on the excess share of units; in Jharkhand 1.5 times above 110% of Contract Demand; in Uttarakhand two times the rate; in Himachal Pradesh three times the rate; in Odisha ₹250 per kVA extra if the crossing is in Peak hours).
- Energy charge = units × energy rate, then the TOD surcharge on peak-hour units and the rebate on off-peak or daytime units.
- Power factor adds a penalty or earns a rebate where energy is billed in kWh. On kVAh billing it is already in the units.
- FPPAS and electricity duty are added from the bill; in UP the due-date rebate comes off if you pay on time.
HT or LT
HT connections take supply at high voltage, usually 11 kV or more. LT connections take supply at 415 volts. The bill lines are the same kind on both; LT schedules have lower demand limits, often bill demand in kW and sometimes charge for reactive energy (kVArh) instead of a power factor penalty. Your bill shows the category at the top: HV-2 or LMV-6 in UP, HTP-I or LTMD in Gujarat, HT-I or LT-IIIB in Tamil Nadu, HT I(A) or LT V in Maharashtra.
Where the bill moves most
- Maximum Demand: one interval above contract demand is charged three times over in UP. See how to reduce Maximum Demand.
- Peak-hour units: each unit moved out of peak hours saves the surcharge; in UP, moving it to off-peak hours saves 30% of the energy rate.
- Power factor: on kVAh billing it raises the units and the kVA demand; on kWh billing it brings a penalty. See improve power factor.
Your bill, live, in KONDUKTOR® EMS
KONDUKTOR® EMS works out the same bill lines from your own meters as the month runs: running Maximum Demand against contract demand, units by TOD zone and power factor, so you see the bill before the DISCOM sends it.
Common questions
How is a factory electricity bill calculated?+
A demand or fixed charge on the billing demand (the higher of maximum demand and a minimum share of contract demand), plus any charge for demand above contract demand, plus units times the energy rate, plus or minus the TOD surcharge and rebate and the power factor adjustment. FPPAS and electricity duty are then added from the bill, and some states take off a rebate for paying by the due date.
What is the difference between an HT and an LT bill?+
HT (high tension) connections take supply at high voltage, usually 11 kV or more, and pay a demand charge per kVA, with a minimum share of contract demand. LT (low tension) connections take supply at 415 volts and suit smaller loads, for example below 75 kW on UP LMV-6 and up to 150 kW on Torrent Power LTMD. LT demand is usually billed in kW; UP and Torrent Power Surat bill it in kVA.
What is billable demand?+
The demand the demand charge is worked out on: the higher of the month’s recorded maximum demand and a fixed share of contract demand. In Uttar Pradesh that share is 75%. In Gujarat it is 85%, with a minimum of 100 kVA on HT and 6 kW on LT. On Tamil Nadu HT it is 90%; on LT-IIIB the fixed charge is on the whole contracted demand. On Maharashtra HT it is 75%, and on LT V it is the higher of 65% of maximum demand and 40% of contract demand. On Rajasthan HT-5 and HT-3 it is 75%, in Madhya Pradesh 90% on HT and LV-4, in Delhi 100% of the sanctioned load, and on Karnataka HT 90%. In West Bengal, Chhattisgarh and on Himachal Pradesh LIPS it is 85%, on Jharkhand HT and Uttarakhand HT 75%, and in Odisha 80%.
Why does the calculator leave out FPPAS and electricity duty?+
Neither is in the tariff schedule. FPPAS changes month to month and can be negative, and electricity duty is set by the state government. Add both from your latest bill.
Can I use this calculator for another state?+
Uttar Pradesh, Gujarat (PGVCL, DGVCL, MGVCL and UGVCL), Torrent Power Ahmedabad and Surat, Tamil Nadu, Maharashtra MSEDCL, Rajasthan (JVVNL, AVVNL, JdVVNL), Madhya Pradesh (West, Central and East DISCOMs), Delhi (BRPL, BYPL, Tata Power-DDL and NDMC) Karnataka (BESCOM, CESC, HESCOM, GESCOM and MESCOM), Haryana (UHBVN and DHBVN), Punjab (PSPCL), Telangana (TGSPDCL and TGNPDCL), Andhra Pradesh (APEPDCL, APCPDCL and APSPDCL), West Bengal (WBSEDCL and CESC), Odisha (TPCODL, TPNODL, TPWODL and TPSODL), Chhattisgarh (CSPDCL), Jharkhand (JBVNL), Uttarakhand (UPCL) and Himachal Pradesh (HPSEBL) have their rates filled in, for HT and LT. For any other state, pick Uttar Pradesh and type your own demand rate, energy rate, minimum billing share, excess-demand rate and TOD percentages over the filled-in values.
How is an HT bill calculated in Gujarat?+
On HTP-I: a demand charge in slabs on the billing demand (the highest of maximum demand, 85% of contract demand and 100 kVA), ₹555 per kVA above contract demand, an energy charge per kWh, a peak-hour charge in paise per unit, a 60 paise concession on units used from 11 am to 5 pm, a power factor penalty below 90% or rebate above 95%, and a rebate for supply at 11 kV and above. FPPAS and electricity duty are added from the bill.
How is an LT industrial bill calculated in Tamil Nadu?+
On LT-IIIB: a fixed charge on contracted demand (₹84, ₹165 or ₹608 per kW by band), ₹8.25 per kWh, 25% extra on units used 6–10 am and 6–10 pm, 5% off units used from 10 pm to 5 am, a charge of 1% or more of the bill for each kW above sanctioned demand, and power factor compensation below 0.85.
Want your real bill checked? We do it free.
Send us your latest electricity bill, HT or LT. We check the demand, TOD and energy lines against your tariff and tell you where the money is going.